
English

Indonesia 500sqm Composite Rubber Tile Project
A newly built gym selected composite rubber tiles for a balance of appearance, shock absorption and long-term performance in multi-use training rooms.
Gym free weight and multifunctional areas
A newly built gym selected composite rubber tiles for a balance of appearance, shock absorption and long-term performance in multi-use training rooms.
Project Background
This reference helps gym owners, distributors and flooring contractors understand how a real project requirement can be turned into a quote-ready rubber flooring specification. Instead of choosing only by product name, the buyer needed to compare application area, expected traffic, installation route, visual finish and long-term maintenance.
For a similar WDER project, the first step would be to confirm the room type, usable area, training intensity, color preference and delivery destination. From there, the factory team can recommend sample options and prepare a specification that fits both the site and the buyer's budget.
Project Challenge
The buyer needed a floor that looked premium while still protecting the subfloor from training impact.
WDER Flooring Solution
Composite tiles combined a visible EPDM layer with an SBR base, giving the gym a cleaner surface and practical shock absorption.
Project Results
- Improved gym appearance after installation
- Reliable impact control in training zones
- Good reference for Southeast Asian distributors
Sourcing Breakdown
This Indonesia reference is useful for buyers planning gym free weight and multifunctional areas. The project size of approx. 500 sqm makes product consistency, packing control and installation planning important before placing a bulk order.
Composite rubber tiles with EPDM surface was matched to the site because the buyer needed a practical balance between surface appearance, shock absorption, daily traffic resistance and installation efficiency.
For a similar WDER order, the factory team would confirm thickness, density, color ratio, sample approval, pallet packing and container loading details before production starts.
Buyers should prepare room drawings, subfloor condition, edge details and zone layout so the flooring quantity, wastage allowance and installation method can be checked before shipment.
Quality & Installation Points
- Confirm color, UV resistance, drainage route and impact-safety expectation for outdoor use.
- Match the surface system with the installer method, binder choice and local playground standard.
- Plan edge treatment carefully so the public play area stays neat and safer after installation.
Buyer Notes
- Ideal for importers looking for a premium tile option.
- Sample confirmation should include surface layer, smell, density and edge finish.
Quote Checklist For Similar Projects
To get a faster and more accurate factory quote, prepare the following information before contacting WDER.
- Target application: Gym free weight and multifunctional areas
- Expected area or quantity: Approx. 500 sqm
- Preferred product system: Composite rubber tiles with EPDM surface
- Thickness, color, density and surface finish requirement
- Destination port, packing method and delivery schedule
- Photos, drawings or zone plan for installation reference
Photos from this flooring reference.


Products connected to this case.
Need a case-based recommendation?
Tell us which case is closest to your project. WDER can suggest a practical flooring system and sample route.


